Skip to content
View in the app

A better way to browse. Learn more.

BluegrassPreps.com

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

XtraIce

Premium Membership
  • Joined

  • Last visited

Everything posted by XtraIce

  1. Update Nov 11 2024 - The walls of the right and left turns with the excavation completed Right Turn wall concrete panels almost installed. Left Turn wall panels almost complete
  2. I would love to see a time lapse video also. Soon we should see progress start on the building foundation. Also, another wall needs to be added to support additional parking where the old entrance road was located. Thanks, for liking the pictures.
  3. View looking back to the facility entrance.
  4. Update for Saturday Oct 26th From the previous post, a lot of work excavating and moving earth on the right and left side of the field to level up the facility by 4 feet. Storm water drainage and installing the concrete inserts between the I-Beams have been the main focus.
  5. When my son played for HHS in 97 thru 2000 the district was with NCC, Brossart and Campbell County.
  6. Updated Army Reserve Road with new side walks, grass and posts for guardrails.
  7. The back straight away and start of left turn is being raised to the new field level. The right turn excavation is in the top right corner of this picture
  8. Land excavation continues on the Right turn of the track. Earth is being move to level the facility. The New Building foundation has been given the go ahead after the soil density was tested and approved.
  9. Update on Facility construction 10/9/24 New Supplies were delivered to begin work on Storm Water Drainage. Sand - Gravel and Pipe
  10. The Parking lot for the complex is getting the slope of the grade set.
  11. Update as of Sept 19th. Was able to get on the upper right side to get a look at the progress on the Left side turn. Work is getting close to having the I-Beams set.
  12. Concrete Inserts - Placed between the I-Beams to make the wall around the right and left turns of the track.
  13. The I-Beam placement is complete on the track right turn. Process of lowering the dirt to field level is progressing. Currently the Dump truck in the picture is being loaded with dirt to be used to raise the parking lot. The I-Beams will be exposed and concrete panels will be inserted between the beams.
  14. Updated today Sept 17th. The Army Reserve Road that runs into parking area and to the right of the Soccer/Track complex is being completed. The road blacktop - curbs and walkway are being worked on. Also the dump truck in the middle of picture is dropping dirt into the new parking area. The parking area is being raised 4 ft.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.