Everything posted by XtraIce
-
Is Highlands' Coach Sphire in a do or die situation?
Not sure about today, but in the past you just needed an apartment and phone number. Also, some families with kids going to different Ohio schools shared apartments so kids could play sports, while living in KY.
-
Highlands 45 Ashland 7
Tax is .48 so total is $9.02.
-
Elder (OH) 40 Highlands 16
KHSAA obtains official enrollment figures from the Kentucky Department of Education (KDE) for boys in grades 9–12. Ohio uses 9 - 11.
-
Elder (OH) 40 Highlands 16
I agree. Ohio has 706 schools playing football and KY has 222. Lot more competition to go thru in OH. Population of Ft Thomas is approx 16,600. Elder draws from 4 zip codes. Still glad we play and I expect it's a teaching moment.
-
Elder (OH) 40 Highlands 16
HHS needed to play this game without errors. Did not happen. Too may mistakes to keep it close. Pick 6, bad timed penalties, bad angle on missed tackles. Elder made mistakes that HHS did not take advantage of. So score reflects the better team advantage. HHS still needs to clean up the mental errors if they want to achieve their goal.
-
Highlands Soccer complex update
Update Sept. 26, 2025 - Inside work on the facility continues. The right side of the parking lot is not yet complete. I expect this to be my last update since pictures of inside the facility are not accessible now. Picture of the field - Taken between games at Homecoming game last night for both Boys and Girls.
-
Highlands Soccer complex update
Update - August 28, 2025 - Building brick being finished up on the middle building. Work has progressed on the parking lot in front of the facility. The wiring for the lighting and concrete pads was completed. The first application of blacktop has been applied to the middle and left side. Building materials that are staged on the right side will move so it can get the first layer of blacktop. Name was added to the top of the scoreboard.  Inside work is progressing.
-
Highlands Soccer complex update
-
Highlands Soccer complex update
The left side is mostly open. My understanding is the will be able to workout in small groups. Also, herd they plan to be able to setup a pitching cage for the baseball team. I believe the public restrooms and utilities for the field. The right side are locker rooms, rest rooms and showers for the teams (visitor and HHS).
-
Highlands Soccer complex update
Update August 13, 2025 - Parking area is being prepared for lighting. New score board is being set. Brick is getting a power wash. Soccer team is getting the feel of the new field and track.
-
Male at Highlands Predictions/Updates (Scrimmage)
If true then why run the ball a lot in a scrimmage, practice what your weak at. Test your players.
-
Highlands Soccer complex update
-
Highlands Soccer complex update
Update July 23, 2025 - Building is progressing. Work on the electrical, plumbing, insulation, and drywall is ongoing. Last layer of rubber surface has been applied to the track. Next Lane Lines will be added. Soccer practices on the field are expected within the next week or so. Home games will not begin until the facility locker rooms; rest rooms, concession and parking are complete. I do not know the exact timing. Finished track surface View from the seats just below the press box Seats in front of the press box
-
Highlands Soccer complex update
Update - July 6th, 2025 - Work continues on the interior and exterior of the building. Topsoil is being applied around the field and the walkway above the right turn. One I-Beam Scoreboard is now in place. Walkway is progressing. Work to provide safe access to the soccer field will be completed in time for them to start practice. Status of the exterior of the building. Scoreboard - One I-Beam in place. Second one will begin soon. Topsoil being applied around the field. This is the shotput area. Also,fencing is being added around the track Walkway work is progressing.
-
Highlands Soccer complex update
Update - June 22, 2025 - Field is complete with new goal assembled. Track will be next. Work on the score board is being started. Brick work on the outside and HVAC on the inside is progressing. The field turned a dark green after the rubber was applied. On the right of the picture is a truck with a hole drill for the new Score board On the far side of the field away from the stands 2X marks the spot for the new Score Board. Mid Field line. Brick being applied. Notice the different colors. The brick is being sorted and mixed on site. Inside work is progressing/ Latter to press box. Entry way to the facility Walkway to parking and old concession building
-
Highlands Soccer complex update
Update - June 18, 2025 - Soccer field turf is getting the last layer of sand and rubber. Assembly of Goals has started. New sidewalk and steps are being worked on. First layer of asphalt has been applied to the track. After the turf is completed the final asphalt layer and top rubberize surface will be applied and then lane lines. Brick work continues. Will get some pictures this weekend. Track Left Turn Track Right Turn Stand view of the field (third row) Sand layer added to the turf Rubber added to the turf Goal Assembly started New Walkway prep work for those that park near the Army Reserve
-
Highlands Soccer complex update
Update June 14th, 2025 - Lots of activity - Field logo's being placed on field with the next step - laying the rubber media. Track is being readied for new surface. Began laying the front facade for the building and roofing shingles in place. Work on the track surface Material staged - Rubber Media
-
Highlands Soccer complex update
Update - June 9th 2025 - Field turf progressing. I saw equipment being dropped off for the track surface to begin (weather permitting). Scaffolding is being setup to begin laying brick. Retaining wall for the parking lot area has been started.
-
Highlands Soccer complex update
Update - Tuesday June 3rd, 2025 - Work started on the Field turf. Later this week or next - the plan is to start on laying the base for the track. Weather permitting.
-
Highlands Soccer complex update
Update May 29, 2025 - I put the wrong date on the above May 17 should have been May 28. Wanted to post two pictures from noon today, Applying the under lament for the turf field. Close up view. Working on concrete and drainage in front of the stands.
-
Highlands Soccer complex update
Update - May 17 2025 - Buildings are being prepared for brick and work progressed on the roofs. The parking area is being graded. The soccer field has been leveled with the first layer of media. New field material has been staged.
-
Highlands Soccer complex update
Update May 17, 2025 - Track field event concrete work close to complete. Track surface being prepared for first pavement. Stands are getting close to complete. Outer building surface being prepared for new brick. Shot Put area - behind the left turn High Jump area Long Jump - Pole Vault New Stands Front view - prep work for new brick & windows Track surface prep for new first payment layer Left turn start of straight away Back side of field support wall - field was raised 4 ft over the last field. On this side it was raised higher due to the land drop off.
-
Highlands Soccer complex update
Update May 8, 2025 - Progress on assembly of the stands. Concrete work on the field events Facility is progressing and the work on the parking area has started back up. Worker welding the seams on the metal roof underlayment.
-
Highlands Soccer complex update
One Project that was started today was the installation of the stands. They delivered the material yesterday. Will be interesting to see how stands build progresses.
-
Highlands Soccer complex update
Yes, they are behind. However they hope to get the track paving started within the next two weeks. Then they will start on the field turf. Hope to get the soccer teams on the in time for start of practice. Hoping for less rain.