Skip to content
View in the app

A better way to browse. Learn more.

BluegrassPreps.com

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Highlands Soccer complex update

Featured Replies

Update - May 17 2025 - Buildings are being prepared for brick and work progressed on the roofs.  The parking area is being graded.  The soccer field has been leveled with the first layer of media.  New field material has been staged.

 

HHS-TrackSoccerBuilding13.thumb.jpg.3984ba08c52c86cbe1ee67d50e79aff9.jpg

 

aHHS-TrackSoccerField2.thumb.jpg.09a2317de1c225d4a6162a666624d380.jpg

 

  • Replies 97
  • Views 28.1k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Runcible Owl
    Runcible Owl

    Frank checking out the above grade progress this spring . . . This looks like a top flight facility and I'm enjoying watching the progress. Great things are going to happen here when comple

  • Update on Field progress.  Began working on the track first turn on the right side of the field.  To hold the hill side and new street location they are placing 30 foot I-Beams onto the ground.

  • New view perspective - field/track with stands

Posted Images

Update May 29, 2025 - I put the wrong date on the above May 17 should have been May 28.  Wanted to post two pictures from noon today,

Applying the under lament for the turf field.

aHHS-TrackSoccerFieldTurf2.thumb.jpg.9357974a1d5ce4d6698cfd07e214877a.jpg

Close up view.

aHHS-TrackSoccerFieldTurf1.thumb.jpg.7abbec672fc9a775a650a8f52aa04052.jpg

Working on concrete and drainage in front of the stands.

aHHS-TrackSoccerStands1.thumb.jpg.7007d33aec5bb91b699e5d1cc6584c2f.jpg

Update - Tuesday June 3rd, 2025 - Work started on the Field turf.  Later this week or next - the plan is to start on laying the base for the track.  Weather permitting.

aHHS-TrackSoccerFieldTurf6.jpg.7555e439cd768bcb15b656a898fe3abb.jpg

aHHS-TrackSoccerFieldTurf3.jpg.18e9e08506a2d4bbad26132b59daf968.jpg

aHHS-TrackSoccerFieldTurf4.jpg.05e60cd0e5ffbc78a3ad9e4f73ec8c10.jpg

aHHS-TrackSoccerFieldTurf5.thumb.jpg.5b9c84805e1e46e3718f183fc7c560a9.jpg

Update - June 9th 2025 - Field turf progressing.  I saw equipment being dropped off for the track surface to begin (weather permitting).  Scaffolding is being setup to begin laying brick.  Retaining wall for the parking lot area has been started.

aHHS-TrackSoccerFieldTurf7.thumb.jpg.3d48bb9a24884c13bfd1e170033d8b98.jpg

 

HHS-TrackSoccerBuilding14.jpg.c45811a4b9c4a782ce3e83bb3e408374.jpg

HHS-TrackSoccerParkingLotWall1.thumb.jpg.00cafafb7b24a757cf55da4b75780ff4.jpg

Update June 14th, 2025 - Lots of activity - Field logo's being placed on field with the next step - laying the rubber media.  Track is being readied for new surface.  Began laying the front facade for the building and roofing shingles in place.

aHHS-TrackSoccerFieldTurf12.thumb.jpg.12a1ede55c0a5c934754ce44ec4e77c2.jpg

Work on the track surface

HHS-TrackSoccerTrackSurface1.thumb.jpg.7c9c3e6f58ae83f3d3381b12344a26a1.jpg

HHS-TrackSoccerTrackSurface2.jpg.dd41e7f6498de3dd334c1478d386cc91.jpg

Material staged - Rubber Media

aHHS-TrackSoccerFieldTurf13.thumb.jpg.bce5c7e618a0375d704e686eb8fc4b04.jpg

 

HHS-TrackSoccerBuilding15.jpg.57f0a0e61606f662bc3ab85d87180377.jpg

HHS-TrackSoccerBuilding16a.jpg.2ea3c7467ba647fe36e805f1ffa8be9b.jpg

 

Update - June 18, 2025 - Soccer field turf is getting the last layer of sand and rubber.  Assembly of Goals has started.  New sidewalk and steps are being worked on.  First layer of asphalt has been applied to the track.  After the turf is completed the final asphalt layer and top rubberize surface will be applied and then lane lines.  Brick work continues.  Will get some pictures this weekend.

Track Left Turn

HHS-TrackSoccerTrackSurface3.jpg.0cd6e38752cc40734ac0b23b715ac298.jpg

Track Right Turn

HHS-TrackSoccerTrackSurface4.jpg.cc900a0dfa3d4f2fe2982948130f305d.jpg

 

HHS-TrackSoccerTrackSurface5.jpg.26bd3f4cf62d9a2177dec733552b1fd3.jpg

Stand view of the field (third row)

HHS-TrackSoccerStandView1.thumb.jpg.4da8cc000ee76843131d55934d98ad4e.jpg

Sand layer added to the turf

aHHS-TrackSoccerFieldTurf14.jpg.50a4d000d6aeb68042c36a9e2ca9120b.jpg

aHHS-TrackSoccerFieldTurf15.jpg.68543cc79197b6f60c86dbafabcd080a.jpg

Rubber added to the turf

aHHS-TrackSoccerFieldTurf16.jpg.3fe3725c6a28ce6dcf163e7ae0bb75a9.jpg

aHHS-TrackSoccerFieldTurf17.jpg.70edd38f0bfed67d9e3ec8b9e5041802.jpg

Goal Assembly started

HHS-TrackSoccerGoalAssembly1.jpg.9232263f0061811f49331906ff1b7f0a.jpg

New Walkway prep work for those that park near the Army ReserveHHS-TrackSoccerParkingLotWallway1.jpg.d55700e0a662e0267ef6f076b24c28f8.jpg

 

Update - June 22, 2025 - Field is complete with new goal assembled.  Track will be next.  Work on the score board is being started.  Brick work on the outside and HVAC on the inside is progressing.

The field turned a dark green after the rubber was applied. On the right of the picture is a truck with a hole drill for the new Score board 

aHHS-TrackSoccerFieldTurf18.jpg.eaf4879513bf80869c324b80787f54be.jpg

aHHS-TrackSoccerFieldTurf20.thumb.jpg.5501701a9cd78c2b735654add58d9934.jpg

HHS-TrackSoccerRightTurn17.jpg.4e794800316722c3a2b4bfd48bfa06fb.jpg

On the far side of the field away from the stands 2X marks the spot for the new Score Board.  Mid Field line.

aHHS-TrackSoccerScoreboard1.jpg.19e2917027b87adb50909e87c286b224.jpg

Brick being applied.  Notice the different colors.  The brick is being sorted and mixed on site. 

HHS-TrackSoccerBuilding17.jpg.7840b686e5be03aa999997d4b01e636b.jpg

HHS-TrackSoccerBuilding18.jpg.1532fe8d64fba3f5d9dfd382befeb2e1.jpg

Inside work is progressing/

HHS-TrackSoccerInsideBuilding1.jpg.1f5f499b73ceea5ddd50088317d02ce6.jpg

HHS-TrackSoccerInsideBuilding2.jpg.4a7bfd9af1776f32e89a67126a8c58ef.jpg

Latter to press box.

HHS-TrackSoccerInsideBuilding3.jpg.5f6a8460e0128cf89e14f823d28bf319.jpg

Entry way to the facility

HHS-TrackSoccerBuilding19.jpg.6ce81b475434cb3d5efa035210fa8b7f.jpg

Walkway to parking and old concession building

aHHS-TrackSoccerStepstoWalkwayandconcession1.jpg.89d6dd9b9dae23e0e25faa52095fa2b1.jpg

Update - July 6th, 2025 - Work continues on the interior and exterior of the building.  Topsoil is being applied around the field and the walkway above the right turn.  One I-Beam Scoreboard is now in place.  Walkway is progressing.   Work to provide safe access to the soccer field will be completed in time for them to start practice.  

Status of the exterior of the building.

HHS-TrackSoccerBuilding20.thumb.jpg.a0b47af917594b3cbc1d1a237d927bed.jpg

HHS-TrackSoccerBuilding21.jpg.501ef4c5850bf0720f911946db68b741.jpg

Scoreboard - One I-Beam in place.  Second one will begin soon.

aHHS-TrackSoccerScoreboard2.jpg.9ca0f8826a94fd5717efec7aa38cb34e.jpg

Topsoil being applied around the field. This is the shotput area.  Also,fencing is being added around the track

aHHS-TrackSoccerFieldShotput1.jpg.5a6ce17be25ccf37ce2322ded5918d93.jpg

Walkway work is progressing.

aHHS-TrackSoccerStepstoWalkwayandconcession2.jpg.8e185d039717dcc1d193cf249311a9e2.jpg

 

 

 

I like the idea of mixing the brick up. This place looks like it’ll be an awesome venue.

Update July 23, 2025 - Building is progressing.  Work on the electrical, plumbing, insulation, and drywall is ongoing.   Last layer of rubber surface has been applied to the track.  Next Lane Lines will be added.  Soccer practices on the field are expected within the next week or so.  Home games will not begin until the facility locker rooms; rest rooms, concession and parking are complete.  I do not know the exact timing.

 

HHS-TrackSoccerBuilding23.jpg.a3274f782bee742a87167f5f4dab4325.jpg

Finished track surface

HHS-TrackSoccerTrackSurface6.jpg.67a06ebe38949b676fdd633f09ef7029.jpg

View from the seats just below the press box

aHHS-TrackSoccerStands2.jpg.a1330dfbf62d339eb03b509b27a6e5a7.jpg

Seats in front of the press box

aHHS-TrackSoccerStands3.jpg.7f91763dd53b26e200e7192d28644f43.jpg

Update July 25th, 2025 - The lines were added to the track today.  Thought it was worth posting.

HHS-TrackSoccerTrackSurface7.jpg.13a7091740bd01910dbe51904c3c84de.jpg

Obviously I’m not a Highlands fan…but this will be the nicest facility in NKY for soccer and easily top 3 in the state..,just my opinion, but this already looks awesome and it’s not even done yet. 

  • Author

Excited to see players on the field!

Just got the green light for the boys to start practicing on field this Monday!  

The Fieldhouse and plumbing stuff still has around 45’ish days or so to get everything finished to allow Highlands to have a game there and for it to be open to the public. Fingers crossed but hopefully we will see a game or 2, maybe some post season games played there.

*** NKU has worked well with Highlands to allow the games that were selected to be home games be played there since Tower Park isn’t ready yet.

I’m oblivious to the soccer calendar in Kentucky. 45 days out puts it into mid-late September. When do the playoffs start? I drove by yesterday and this facility is phenomenal looking. 
 

I always feel bad for the class that couldn’t play in a new building/field and jealous of the ones that can. I’d venture to say that anyone involved in soccer or track and field that played for the Birds will be extremely proud of the facility. Good job to the folks in FT Thomas. If you’re to do something do it right and it looks like they hit a home run.

  • Author
1 hour ago, Breds82 said:

I’m oblivious to the soccer calendar in Kentucky. 45 days out puts it into mid-late September. When do the playoffs start? I drove by yesterday and this facility is phenomenal looking. 
 

I always feel bad for the class that couldn’t play in a new building/field and jealous of the ones that can. I’d venture to say that anyone involved in soccer or track and field that played for the Birds will be extremely proud of the facility. Good job to the folks in FT Thomas. If you’re to do something do it right and it looks like they hit a home run.

Last regular season “home” game is Sept 25th. Then Districts, then Regionals, etc…..

Luckily that Sept 25th game is slated to be “Senior Night”, so the festivities hopefully will be at Tower Park for that special night.

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.