Highlands Soccer complex update

Featured Replies

  • Author
1 hour ago, XtraIce said:

Update as of Friday Jan 31st 2025

Work continues on the building footers and support posts for stands.  

HHS-TrackSoccerBackofBuilding1.thumb.jpg.945ab08df1c36b13ced7b7610e45c437.jpg

Below is the View facing the start of 100 meter dash - Left turn on the track.

HHS-TrackSoccerBuilding_footer9.thumb.jpg.68561142161f80c263d40c3afacb5718.jpg

 

HHS-TrackSoccerBuilding_footer10.jpg.ddb96544d91f4fddabded6a82eefcfdf.jpg

Below - View facing the right turn and the Army Reserve road

HHS-TrackSoccerBuilding_footer8.jpg.31b9b491041870d76acaa2c91c972432.jpg

 

 

When will we see something come up from the ground for either the stands or fieldhouse?

  • Replies 97
  • Views 28.1k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Runcible Owl
    Runcible Owl

    Frank checking out the above grade progress this spring . . . This looks like a top flight facility and I'm enjoying watching the progress. Great things are going to happen here when comple

  • Update on Field progress.  Began working on the track first turn on the right side of the field.  To hold the hill side and new street location they are placing 30 foot I-Beams onto the ground.

  • New view perspective - field/track with stands

Posted Images

On 2/3/2025 at 5:14 PM, FrankNicodemus said:

When will we see something come up from the ground for either the stands or fieldhouse?

Not sure of the timing.  I know they are hoping for good weather so they can keep progressing.   Today they were back moving dirt.  I also noticed new survey markings on the ground for additional footers.

Drove by the field to see the progress in person. You start to see how the layout will be with respect to the drawing. It'll be a huge hit with the soccer and track communities.

Update 2/24/25 - Work progressing on Rough in on Plumbing and adding steps to the facility from the upper parking area.

Pluming

HHS-TrackSoccerRoughinPlumbing1.jpg.134937409210efdfe9254e17f79e6444.jpg

Starting the forms for the steps to the facility

HHS-TrackSoccerStepstofield1.jpg.a0c393557721acd6dbe1e463df8b1516.jpg

Additional facility pictures.

HHS-TrackSoccerRoughinPlumbing2.thumb.jpg.d380eee60b5dff4683711cdc146121a9.jpg

HHS-TrackSoccerRoughinPlumbing3.thumb.jpg.29afe15e005b5106efcda356c1b8a19b.jpg

 

On 2/3/2025 at 5:14 PM, FrankNicodemus said:

When will we see something come up from the ground for either the stands or fieldhouse?

Frank checking out the above grade progress this spring . . .

peeking-sneaking.gif

This looks like a top flight facility and I'm enjoying watching the progress. Great things are going to happen here when completed, on the pitch and on the track.

Exciting times in the City of Beautiful Homes. 

Update as of 3/5/25 - Rough in of Plumbing mostly completed.  Next is the block foundation to start this week.  Will be about two block high.  After that will be pouring the floor and then building assembly will start.  The steps for the upper parking area to the facility are complete.  This will help the workers that park there to get to the facility easier.

Rough-in of Plumbing - Also notice the wall in the back had the vertical I-Beams painted Gray.

HHS-TrackSoccerRoughinPlumbing4.jpg.cd43c6059bc65e755905478bf1b60c5b.jpg

Steps to the facility.

HHS-TrackSoccerStepstofield2.jpg.877a77f52e00df995af1c1d5ea31d27a.jpg

Foundation block delivered and work to start this week.

HHS-TrackSoccerFoundation1.jpg.b8d5165c22c01f2c302ab8528ded39fd.jpg

Update: 3/10/2025 - Foundation almost completed.  They are applying a Lime solution to the field to dry and help the leveling of the field and compact the dirt.  The walkway at the top of the right turn is in progress.

Foundation from two directions -

HHS-TrackSoccerFoundation2.thumb.jpg.0cf40fc2dae31589653c6a9485d23518.jpg

HHS-TrackSoccerFoundation3.jpg.b9da3cc137c47e2e99f8f883e5aa4eb9.jpg

 

View of right turn -  applying the Lime solution to the field

HHS-TrackSoccerRightTurn12.thumb.jpg.1febd093ad0eb6ab6524dcce8ac63a77.jpg

View of the top of the right turn side walk.

HHS-TrackSoccerRightTurn13.jpg.d4cb0ac23d4d1be10e3c185ca255788c.jpg

 

Update 2/17/25 -  Pouring the concrete floor for building on the right as you enter the facility.

Views from different angles taken before noon today.

HHS-TrackSoccerFoundation4.jpg.213989f27fe78f3d76dddd634204d3ab.jpg

HHS-TrackSoccerFoundation5.jpg.f186d96027578ee63cd030e1ce55f0ce.jpg

As of 4pm the second building floor prep is almost completed (no picture)

Update - 3/28/25  - Work on the building concrete pad/floor is mostly complete.  They are now moving the steel building structures in place to begin the assembly.  Duke Energy is moving the electrical.  The first light pole component is being set in place.  They moved the mobile office so they can begin working on adding additional walls.

 

aHHS-TrackSoccerFieldLighting1.jpg.75d1f99d71fc7b6f61094c2cd01858b2.jpg

Duke working on the electrical lines

aHHS-TrackSoccerDukeElect.jpg.6b5e3947f3d8c3a1c6996ab5879107de.jpg

Staging the Steel for building.  The mobile office that was in the background was move to another location

HHS-TrackSoccerBuilding1.thumb.jpg.2ec38a61569acbf4827736d5773c3c29.jpg

Work continues on the field water drainage.

HHS-TrackSoccerWaterDrainage10.jpg.2a1a1cfb880db0a159ea3b7eba4e7c0e.jpg

 

Update - 3/31/25 - Big milestone, started to build the first building today. 

Projects first bucket of dirt was moved on May 30th, 2024.

Pic taken at noon today.

HHS-TrackSoccerBuilding2.thumb.jpg.f3cd66a6b5afe93e113bd3fe49e528e6.jpg

End of day 3/31/25

HHS-TrackSoccerBuilding3.jpg.a4a51c4e911da1a6a0c406c15a26e0a1.jpg

HHS-TrackSoccerBuilding4.jpg.29e538ce54706101d68d292ddbaf31af.jpg

Update April 3rd, 2025 - Progress on the building steel assembly is moving fast.  They started on the second building yesterday.

Also, the curb between the track and field is progressing.  Working thru the mud caused by the storms that moved thru the area last night

Building progress from two angles.

HHS-TrackSoccerBuilding5.thumb.jpg.135a4ef1474e4fcc857b4c87a31d5d9c.jpg

HHS-TrackSoccerBuilding6.jpg.cd48eea5f55b10b1d268e35fe06d10a5.jpg

Right Turn of track progress

HHS-TrackSoccerRightTurn14.jpg.90714068f2b451ec6f4ee9afe042c24e.jpg

HHS-TrackSoccerRightTurn15.thumb.jpg.2281c8d4e6248873a9a1aa04cbdb50c5.jpg

Back straight away facing the left turn of the track.

HHS-TrackSoccerLeftTurn7.jpg.0beae12432ac278a9af8588e0e556da6.jpg 

 

 

Update - April 13 2025 - Building steel assembly getting close to being completed.  They are working on the middle structure.

This is the rendering I have not sure if it is the latest.

HHS-TrackSoccerBuilding8.thumb.jpg.f9967109c7c792f3fcf678eb11c6c606.jpg

Front view of current progress

HHS-TrackSoccerBuilding7.jpg.57bab949e923dc55fa7b2bc65ea36a9b.jpg

View from the back - field side viewHHS-TrackSoccerBuilding9.thumb.jpg.c070387aef51e4b2db65777860556acd.jpg

 

I like it. It has character, a lot of which goes out the window because character costs money.

Saw the field today. It’s a lot easier to get a true idea of how it’ll look in regards to the drawings. It’s going to be a real nice facility for everyone that uses it.

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.