Highlands Soccer complex update

Featured Replies

Update April 18 2025 - Field lighting going into place.  Field drainage close to complete and first layer of field media being applied.  Concrete walkway around the track in progress.

Two of the four lighting poles are set,

aHHS-TrackSoccerFieldLighting2.jpg.bb3eac12aaa559ea6970153e0c0b1e3a.jpg

Field water drainage system.

HHS-TrackSoccerWaterDrainage11.jpg.daa2fc06bfad44421f633b55b8bd6470.jpg

First layer of field media being applied

aHHS-TrackSoccerFieldBaseMatl1.jpg.0672f875f487508a1afd9c1b0415a2d7.jpg

Concrete walkway around the track.  This is the start of the left turn.

aHHS-TrackSoccerFieldconcretewalkway1.jpg.06c004e9878b4bf8759c848faff7f730.jpg

 

Post hole forms are being place for fencing around the right turn.

HHS-TrackSoccerRightTurn16.jpg.150e7b4bf5b6f91c05243f86013814f6.jpg

  • Replies 97
  • Views 28.1k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Runcible Owl
    Runcible Owl

    Frank checking out the above grade progress this spring . . . This looks like a top flight facility and I'm enjoying watching the progress. Great things are going to happen here when comple

  • Update on Field progress.  Began working on the track first turn on the right side of the field.  To hold the hill side and new street location they are placing 30 foot I-Beams onto the ground.

  • New view perspective - field/track with stands

Posted Images

As I look through the pictures, it looks like they completely changed the footprint and orientation of the complex. Did they turn the field/track 90 degrees? New building and entrance is going to be where the old lower parking lot was? Am I right on that?

I thought the buildig was going to be by the current press box/concession stand.

30 minutes ago, Breds82 said:

I thought the building was going to be by the current press box/concession stand.

It doesn't look that way to me in the pictures posted. Look at the last picture posted above. Isn't that the old concession building on the hillside in the background behind the new building?

I also kept wondering as I looked at the pics why they need those retaining walls for the turns on the track when I don't remember any need for them on the old track. But if you turn the track 90 degrees you would probably have to cut into the hillsides of the bowl to fit the track in.

Just within the radius of Bellevue, Dayton, Newport, Highlands and NewCath, is it just a coincidence with the field upgrades/construction? Whatever it is it’s long overdue.

43 minutes ago, Jack of all Trades said:

The field has been moved back and turned 90 degrees.  Going to be a real nice complex.

Thanks for confirming JOAT! Yes, it looks like it will be an awesome complex.

On 4/19/2025 at 1:10 PM, Voice of Reason said:

As I look through the pictures, it looks like they completely changed the footprint and orientation of the complex. Did they turn the field/track 90 degrees? New building and entrance is going to be where the old lower parking lot was? Am I right on that?

Yes,  they moved the field to the far back on the property and change the orientation.   They had to build a retaining wall to support the field.   The field was raised 4 feet higher than the old field.

By raising the field and pushing it back will allow for more parking in front of the new facility.

The drive into the facility was changed, so now you will have a more straight drive to the parking area.  The old right turn the left turn is gone.

On 4/19/2025 at 1:43 PM, Breds82 said:

I thought the buildig was going to be by the current press box/concession stand.

This shows where the new building is compared to the old field. The wall in the background is where the right building is located.  The photo is taken from the old building  concession area.

image.jpeg.d13b93f3e9c5a47c151bbae81eb0c28c.jpeg

Update May 5, 2025 - Work continues on the building, the metal roof deck is being installed.  The first base for the field has been applied and field events for track are being added.  

HHS-TrackSoccerBuilding11.thumb.jpg.8bb19fb23ff3272a3a781ca2f20f02b3.jpg

 

aHHS-TrackSoccerFieldEvents1.jpg.b82b4bf65b2cb38695523e465c869738.jpg

 

aHHS-TrackSoccerField1.thumb.jpg.2daac5f765224a41124a017cce5d853c.jpg

The below picture shows how the road going into the facility was changed.

aHHS-TrackSoccerFrontDr2.jpg.1423294a769645e7502783b6a53eee06.jpg

 

Coming along nicely. Has the weather pushed the finish date back at all?

14 hours ago, Breds82 said:

Coming along nicely. Has the weather pushed the finish date back at all?

Yes,  they are behind.  However they hope to get the track paving started within the next two weeks.  Then they will start on the field turf.  Hope to get the soccer teams on the in time for start of practice.   Hoping for less rain.

One Project that was started today was the installation of the stands.  They delivered the material yesterday.  Will be interesting to see how stands build progresses.

aHHS-TrackSoccerBuildingStands1.jpg.887a7ef1bbec910fac392673f15738ab.jpg

Update May 8, 2025 - Progress on assembly of the stands.  Concrete work on the field events

Facility is progressing and the work on the parking area has started back up.

 

aHHS-TrackSoccerBuildingStands2.jpg.c51a98566d59901e8719c77877fc83b1.jpg

aHHS-TrackSoccerBuildingStands3.jpg.0dda7034f7ca41d54dd48debcfc4f836.jpg

 

aHHS-TrackSoccerWalkwaytooldbuilding2.jpg.5797c0cd151d838989e4ab844eb3f54f.jpg

Worker welding the seams on the metal roof underlayment.

aHHS-TrackSoccerBuildingroof1.jpg.5732669816a8e4843b0dfb5802cea2d5.jpg

 

aHHS-Track&Soccer Field Events2.jpg

Update May 17, 2025 - Track field event concrete work close to complete.  Track surface being prepared for first pavement. Stands are getting close to complete.  Outer building surface being prepared for new brick.

 

Shot Put area - behind the left turnaHHS-TrackSoccerFieldEvents4.thumb.jpg.765271d9e068c7161640f07ff0071c1a.jpg

High Jump area

aHHS-TrackSoccerFieldEvents5.jpg.00dfc77c4afd8d4764f1b8e8171fc212.jpg

Long Jump - Pole Vault

aHHS-TrackSoccerFieldEvents6.thumb.jpg.538cb15f741ba79ac096fcbd0fcfc6b6.jpg

New Stands

aHHS-TrackSoccerBuildingStands4.thumb.jpg.88767b0c7d798a0ad6bea4b7ada806d0.jpg

Front view - prep work for new brick & windows

HHS-TrackSoccerBuilding12.thumb.jpg.e2427fdf2b0d3816425fbb2c9f649dee.jpg

Track surface prep for new first payment layer

HHS-TrackSoccerTrackBackStright2.thumb.jpg.645ac16324b2578dc62c001aa548b5ef.jpg

Left turn start of straight away

HHS-TrackSoccerLeftTurn8.thumb.jpg.5b4a3113ca30e0aa8c9ec7011ede825d.jpg

Back side of field support wall - field was raised 4 ft over the last field.  On this side it was raised higher due to the land drop off.

HHS-TrackSoccerSupportWallraisefield1.thumb.jpg.d713dfe4020813f561b8af5852134411.jpg

 

 

 

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.